1. All in English& Imperial Un...
1. All in English& Imperial Unit. 全部使用英文和英制单位。 2. Are part dimensions to print plus shrink?请检查内模尺寸有否乘缩水? 3. All wires protected from sharp corners?凡有电线通过的角位要改为R角,是否完成? 4. All replaceable components must be standard components. 所有替换的元件必须是标准件。 5. Add shot counter?是否加啤塑总计器? 6. A complicated mould with thorough design consideration toovercome the numerous design contraints. 一个复杂的模具,设计经过周详考虑,成功地克服了各种设计上的限制。 9. BeCu for lifters if w/o water circuits。若没有运水回路,斜顶为铍铜。 10. Corresponding components mirrored at core&cavity. 对应的部件在前、后模平面视图中镜像。 11. Check polish for line of draw finish?有否省光就出模? 12. Core pull slot mechanism installed and O.K. 13. Crane capacity and loading clearance. 模具须用多大吊机才可搬动。 14. Conduct moldflow&mold warp analysis. 经流道及变形电脑模拟分析。 15. Component and/or 3D mould design drawing. 散件图或3D模具图。 16. Cooling less important when dimensions are not important. 若尺寸不重要,适量冷却也可。 17. Combine a traditional 4 cavity edge gate and a 4 cavitiesreverse gate mould which help to double the moulding capacity and reduceproduction cost. 将一个标准四模腔大水口模具与一个四模腔倒转大水口模具结合成为一套可于同一大小的注塑机,生产量可增加一倍的层板模具,并且可降低成本。 18. Can be seperated into two individual moulds for moulding in twodifferent mould shops. 此模具*大的特式是,可将模具分开变成两套,在不同地方生产,增加生产的灵活性。 19. Consists of all standard mould components which facilitatesmould maintenance. 由于全套模具均利用模具标准零件制成,在维修及换零件上比较方便。 20. Die draw called out 出模方向的标示 22. DME egr. Water fittings recessed and marked?是否使用DME运水接头及编号? 24. Eyebolt size and balance in 2 sides. 吊模孔尺寸,平衡,4边都要有。 26. Ejection study if lifteradopted. 若有斜顶,做出分析。 27. Ejection extended at the most. 顶出到极限位置。 28. Ejector guide pins installation. 顶针导柱的安装。 29. Eyebolts for inserts more than 50lbs. 重量大于50lbs的镶件必须要有吊模孔。 30. Edge gate or sprue gate requiring secondary operationacceptable. 边缘型或直入型水口都可以接受。 31. 4 point in HRC different to lifters contacting or cavity steel. 斜顶和与其接触的内模或镶件在硬度上有4度的差别(HRC)。 35. Guide pin cleared and vented?边钉插入模板有否顶着及加疏气空? 36. Hot manifold wired to print and checked?热咀电线接位有否编号? 37. Horn pin clearance hole?斜边与行位有否空间? 38. Hydraulic actuated slide together with electrical limit switch. 行位采用油压推动,配合安全电制。 40. Inserts keyed and numbered to prevent incorrect assembly. 镶件定位和编号以防止不正确的组装。 41. Jaw angle 3 deg.more than angle pins(<25 degree). 斜面角度要比行位斜边角度大3度(<25度)。 42. Keep enough space to run waterline at slide /lifter/majorinserts. 在行位、斜顶、主要镶件处保留足够位置(空间)布置水槽。 42. Lifter angle less than 15 degree. 斜顶角度小于15度。 44. Limit switch in tact and protected. 是否已安装限位制? 45. Moldbase and steel dimensioned. 模坯和钢料号的标注。 46. Minimum 5 deg.for shut-off. 斜顶镶件最小5度插穿。 47. Mechanism for sequence?动作机构是否正确? 48. Mold safety straps installed and painted red?是否已安装安全带及喷上正确颜色在模坯上? 50. Mould should be designed with maximum cooling and withappropriate amount of ejection points. 模具在设计上要做到尽快冷却,上、下内模高温点应该有个别的冷却,应有适量顶针。 51. Mould should be able to run fully automatic. Large part shouldbe picked up by robot. 模具能够全自动生产,大的零件应由机械手拿出。 52. Mould should be tested to meet a defined Cpk quality standard. 模具经过测试,符合预定的Cpk质量标准。 55. Mould requiring heating should have insulator plate. 需要加热的模具,必须有隔热板。 56. Mould preferred to run automatic; self-degating wheneverpossible. 模具*好能自动生产,模具尽可能自断水口。 57. No obstructions on buttom surface of mold?模具必须稳定位置如有凸出物请加脚座,是否完成? 58. Overall mold size of the moldbase & shut height 模坯长宽和模厚(模架的长宽) 60. Protruding items shown and protected. 画出突出部件并做好保护。 61. Parting line at the acceptable surface. 合模分布在合理可接受的表面。 62. Put waterline as much as possible/wherever possible. 尽可能布置多的运水。 63. Put waterline for slide /lifter/insert wherever possible. 尽可能在行位、斜、镶件布置运水。 65. Proper locating ring and diameter?定位圈尺寸及直径是否正确? 66. Proper radius and orifice on sprue bushing and keyed.唧嘴R及管钉是否正确? 67. Part line lock recommended when there is shut off. 当有擦位时,*好有直身锁保护。 68. Protruding items shown and protected. 如有零件凸出,模坯请加保护物。 70. Runners to be balanced. 流道必平衡。 71. Runners cross section type and size as per standard. 流道切面形状和尺寸符合标准。 72. Runner and parts should be ejected automatically .Multipleejection should be avoided. 顶出方法可使流道与产品自动掉下,避免运用多次顶出方法。 73. Sufficient view and section. 足够的视图和切面图。 74. Safety Strap in red. 模块藏入模坯,要涂成红色。 75. Standing steel supported to keep stable. 加撑脚以保前、后模能平稳放置。 78. Sucker with reverse 10 deg. Undercut. 10度倒扣的流道拉料杆。 79. Steel type & hardness of slide &heel blocks. 行位和压条的料号和硬度。 81. Sufficient stroke for floating plate?浮动板是否有足够的行程? 84. Special instruction stamped on top and operator side?客户如有特别指示请打在模坯顶及操作面上,有否完成? 85. Screws tight and all installed?螺丝是否全部收紧? 86. Support posts ground and screwed to clamp plate and pre-loaded. 撑头是否高出方铁? 88. Standing steel well supported?成品与内模之间的钢材是否足够? 90. Self-degating whenever possible .Hot runner system should beconsidered.…… 热流道系统应该加以考虑。 91. Standard components should be used. 尽量使用标准件。 92. Semi-automatic and use of mould release acceptable. 半自动工手放镶件也可。 93. Update title block/revision. 更新标题栏/版本。 94. Use standard components when appropriate. 适当的时候使用标准件。 95. View of deepest point *深点(位置)的剖切视图 96. Water circuits should run out form the ejection box. 运水应从出水槽中流出。 99. Waterlines clear tie bars. 运水喉咀接驳位要离开啤机呵林柱咀接驳。 100. Waterline clear clamp slot. 运水喉咀接驳位要离开啤机码模坑